Railway line commissioning
Contributing to the track and overhead contact line commissioning process for high-speed and conventional lines.
Tests objectives
Qualify track and OCL by analyzing dynamic behaviour and current collection (contact force and arc measurements)
Tests facilities
- Arc detector on the OCL
- Instrumented pantograph
- Accelerometers for track monitoring
- TSI trainset
- Measurement of OCL uplift
Accreditations
ISO/IEC 17025 awarded by COFRAC
Testing norms
EN 50367 – Current collection systems – Technical criteria for the interaction between pantograph and overhead line (to achieve free access)
IN 2542 – Raising train and similar speed limits – technical provisions
UIC Technical Document – Guide for the approval of high-speed lines
TSI Energy, High-speed and Conventional rail
Please complete the contact form. One of our engineers will be in touch with you as soon as possible.
Go to formOur references
ALSTOM
INFRABEL
LLOYD’S
RFF
SNCFI
TP FERRO
CLERE
SYSTRA
COSEA
OC’VIA